Showing posts with label socks. Show all posts
Showing posts with label socks. Show all posts

Wednesday, October 26, 2011

More September Knitting

In addition to LeLe's Square Shawl, I started two other projects in September. One was a pair of socks, which I completed; the other was a shawl, which I started at the end of the month and didn't complete until early October.

The socks were Wendy Johnson's Diamond Gansey Socks, from her book Socks from the Toe Up. I knit these socks for a fellow knitter, with yarn she provided. The socks were knit with Knit Picks Shadow Tonal in the Dusk colorway. The yarn was 30 percent silk, and because of the silk content, the socks aren't as stretchy as socks made of all wool yarn or of wool-nylon yarn. The ankles (to me) seemed baggy, but they fit the recipient, which is all that matters. I started these socks on 15 September and finished on 26 September. (As always, click on any photo to enlarge.)

The shawl was a test knit. It's called the Sabrina Shawl, and it was designed by Marisa Hernandez. It was a fun---and fast---knit, and the shawl is lovely. I knit this shawl in Dream in Color Smooshy (one of my favorite yarns) in the Visual Purple colorway. My shawl required a bit more than one skein of yarn (477 yards) and was knit on a US5 needle.

I started this shawl on 28 September and finished it on 06 October, so it only took eight evenings to knit. In the photo at right, I'm modelling the shawl at my LYS (local yarn store) for the lace knitting group I lead on Tuesday afternoons.

I've been thinking about bigger projects---sweaters, specifically---but I'm trying to complete several projects that have been languishing on the needles for a while before I start a sweater. I've also been working on my next-to-last Christmas project (a shawlette for my son's fiancee).

What are you knitting or thinking about knitting?

Susannah

Thursday, September 29, 2011

August Adventures in Knitting

My August knitting was less varied than any other month this summer. A great deal of time was spent test-knitting one garment, leaving little time to knit other things. Not that that fact stopped me from knitting---and finishing---other garments.

First up in August was Wendy Johnson's Phoebus Apollo Socks. My socks were knit with Cascade Heritage Sock Solids yarn in the Purple Hyacinth colorway. Although the pattern looks cable-y, there isn't a cable to be found. The moving stitches are created by cleverly placed combinations of knit2together, slip-slip-knit, and yarnover. (As always, click on any photo to enlarge.)

The pattern was interesting enough to hold my attention all the way to the top of the socks. The photo below shows a close-up of the pattern. The socks, which were knit toe-up (my favorite method!), have a slip-stitch heel with a gusset and K1P1 ribbing. Since I made these socks for myself, I used a sewn bind-off. (The stretchier bind-offs, such as the Russian bind-off and Jeny's Surprisingly Stretchy Bind-off, are too loose on me, but work well for other members of my family.)

I started these socks on 23 July and finished on 11 August. They were my second project for "Camp Loopy"---a camping-themed series of projects (with prizes) sponsored by The Loopy Ewe. (My first Camp Loopy project was the Roma Shawl.)

Next, I finished up a shawl I started last year. This is the Diamonds and Branch variation of the As One Stole. I test knit this pattern last summer, but had lots of yarn left after completing the ten pattern repetitions the pattern required. After giving the designer all the information she required about the stole, I made mine longer. My plan was to knit until I ran out of yarn, but I stopped after fifteen pattern repetitions, when the shawl was almost as long as I am tall.

The shawl was knit with Interlacements Spiderweb yarn in the 201P Blues colorway. I used 925 yards. After blocking, my shawl was 87 inches long and 22 inches wide. I started this shawl on 16 July 2010 and had knit 10 pattern repetitions by 24 August 2010. But it took me until 15 August 2011 to knit the five additional pattern repetitions, mostly because I knit many other projects in the meantime.

My next project was test knitting the pattern for a Danish work shawl. The designer has not yet released the pattern, so I can't blog about this shawl yet.

Next, I finished the Old Man of Storr shawl, which I started on 04 July 2011 for a "knit in the car" project. I only worked on this shawl in the car while my husband was driving. The shawl was knit with Dream in Color Smooshy yarn in the Ocean Current colorway.

I love the colors in Dream in Color yarn, and this colorway was no exception. The shawl was an easy knit, but although I followed the pattern exactly, I ran out of yarn partway through the fifth pattern repetition. (The designer had used DIC yarn, but knit six complete pattern repetitions.) I had to rip back two rows to have enough yarn to bind off the shawl, and even then I fell four yards short. The final twelve feet of the bind-off were knit with Dream in Color Smooshy in Romeo Blue, which was left over from a pair of socks I knit the BoyChild a year or so ago.

My final project in August was LeLe's Square Shawl by Nancy Bush, from her book, The Knitted Lace of Estonia. I started this project on 17 August, using Fiesta Gracie's Laces in the Arctic Ice colorway. I'll blog about this shawl in September, since I knit half the shawl in August and half in September.

What have you been knitting this summer?

Susannah

Sunday, September 11, 2011

July Adventures in Knitting

I've been busy knitting (and not blogging), but I've also been waiting for a couple patterns I test knit to be released. One pattern still has not been published.

My July adventures in knitting started with test knitting a scarf for Esther Budd, the designer for whom I test knit HRH Kate's Shawl in May. This scarf comes in three variations (as did HRH Kate's Shawl); I knit the second version, as I did for Kate's Shawl. Choosing the same pattern variation to knit was probably a mistake; I was bored with it long before I finished the scarf. (As always, click on any photo to enlarge.)

The secret to scarf knitting is swatching and a bit of math. The final scarf should be 8-10 inches wide and about the same length's as the recipient's height. If you don't knit a swatch and block it, you have no idea how wide or long the finished scarf will be. My swatching and math told me the scarf should be 44 stitches wide and 66-68 pattern repetitions in length, so 44 stitches wide and 68 pattern repetitions is what I knit. Lo and behold, the final dimensions of the scarf were 10.25 inches wide and 75 inches long.  (I could have quit after 65 or 66 pattern repetitions, since the recipient, my husband, is 6 feet (72 inches) tall.)

The scarf was knit with Black Water Abbey two-ply sportweight yarn, in the Haw colorway. I used 1.25 skeins or 438 yards. I started this scarf on 03 July and finished it on 14 July. The close-up on the right shows the zig-zag pattern more clearly.

My next knitting adventure, another test knit, was a pair of socks---the Ornamental Socks by Angela Whisnant. It had been at least a month since I'd knit a pair of socks, so I was happy to knit these. The pattern close-up below better shows the design, which looks like a shamrock.

The socks were knit toe-up, in Schoeller + Stahl Fortissims Socka in the 1015 Blue colorway.  I started the socks on 12 July and finished on 22 July.

One bit of advice for anyone planning to knit these socks: Don't knit them for someone with big feet. The pattern repetition is very small, and even though I was knitting the socks for Niece-with- Smallest-Feet, I was bored with the pattern by the time I turned the heel.

My final project was a shawl I started in May. This was another test knit. I call it the Name Game Shawl, but the designer, MMario, named it "They Call Me MMario." He described it as "a warped version of feather and fan crossed with a left-handed swirl."

The shawl, which was worked in the round, was knit with Great Adirondack Silky Sock yarn in the Cantaloupe colorway.

The pattern repeats eights times on each round. The directions said to knit the vertical pattern repetition until "long enough." I did three vertical pattern repetitions, but if I had it to do over again, I'd knit four, since the shawl didn't block out as large as I expected.

I started this shawl on 09 May and finished it on 30 July. I used 2.3 skeins, or 830 yards, of yarn. This shawl was my "knit during lace class" shawl, which meant that I only knit it on Tuesday afternoons, except at the very end, when I used it as my "knit in the car" project, then finished it on a weekend.

The last project I started in July, a pair of socks, I'll tell you about with August's adventures, since more knitting was done in August than July.

What have you been knitting this summer?

Susannah



Monday, August 1, 2011

June Adventures in Knitting

The final pattern I test knit in June has been released, so I can now discuss my June adventures in knitting.

My first knit was a shawl, a test knit. The Cutting Ferns Shawl, by Fiddle Knits, is part of her Shades of Green collection (as was the first shawl I knit in May, which I called an Uncertain Shade of Red, since the yarn I used was a variegated red). The pattern for the Cutting Ferns Shawl calls for bulky yarn, but since my specially ordered yarn was purportedly shipped to another store, the designer allowed me to knit the shawl with worsted weight yarn. I used Stitch Nation Alpaca Love in the Lake colorway. (As always, click on any photo to enlarge.)

I started this shawl on 08 June and finished on 11 June. Seems amazingly fast, doesn't it? But the shawl has only 71 rows. My shawl has a wingspan of 58 inches and a depth of 20.5 inches---a bit small in my opinion. This shawl would be larger if knit with a bulky yarn.

The night I finished the Cutting Ferns Shawl, I looked around for something else to knit---something that I could knit in the car. Instead of starting something new, I decided to finish a pair of socks that had been languishing on the needles since 30 April. The socks were done except for the ribbing, so I was able to finish them that night.

The socks are Wendy Johnson's Serpentine Socks. I like the sock pattern very much, but unfortunately the yarn's color variations obscure the pattern. The socks were knit with Fiesta Baby Boom yarn in the Spring Chill colorway. These socks are going to be a Christmas present for one of my nieces.

Next I knit another shawl (another test knit). This is the Elvia Shawl by Usch Engelmann. This shawl was knit with five skeins of Jojoland Melody Superwash in the Cinnabar Flare colorway. This shawl's construction was ingenious. Despite the ruffle, the shawl was knit from the top down, with the ruffles on the front edges knit using short rows. I was intrigued by the way the color patterning of the yarn changed as I went along.

I started this shawl on 12 June and finished on 28 June. The shawl has a wingspan of 66 inches and a depth of 29 inches. I may give this shawl to my youngest sister for Christmas. She likes---and looks good in---peach and coral, and the shawl is light enough in weight that she won't get overly warm.

My final shawl for June was the Roma Shawl by Kirsten Kapur. I chose to knit the version with the willow edge border, and I'm very pleased with the result. This shawl can be knit with lace or fingering weight yarn. I chose lace-weight. I used Fiesta Gracies's Lace in the silhouette blue and snow colorways. I used a little less than half the skein of blue, and a bit less than one-fifth of the skein of snow.

I started this shawl on 16 June (yes, I really did start it before I finished the previous one) and finished on 03 July. It's a big shawl---the wingspan is 79 inches, and it's 39 inches deep.

The Roma Shawl was the twelfth shawl I started this year, and the eleventh one I finished.

In addition knitting these three shawls and finishing the socks, I also worked on a summer top, which isn't quite finished. I'll tell you about it when it's done.

What have you been knitting this summer?

Susannah

Wednesday, March 30, 2011

March Socks

Spring has yet to make an appearance in northern Indiana, but these colorful socks added a bit of springtime to my days. Well, actually, to my evenings, since my days are occupied by work.

I only knit one pair of socks this month. I chose Wendy Johnson's Ribbed Ribbons Socks, from her book, Socks from the Toe Up. I modified the socks to fit my narrow feet by removing the first stitch of the pattern repetition. I also chose to repeat the pattern on the back of the leg. The socks were knit in Dream in Color Smooshy, in the Giant Peach colorway. I started these socks on 06 March and finished on 18 March, but due to the weather, which was grey and overcast, I was unable to take a decent photograph of them until the 25th. (As always, click on any photo to enlarge.)

In addition to these socks, I have nearly finished---I'm in the process of binding off---a large shawl, and have knit the body of another one, and begun its knitted-on edging.

What are you knitting to encourage spring to make an appearance?

Susannah

Tuesday, March 8, 2011

February: Two FOs and an Almost Finished One

February is a short month, which I usually think is good, since it is the depths of winter, but this month I could have used a few more days. I did knit a pair of socks---and most of a second pair---and have continued sporadically working on a shawl.

The first pair of socks was Wendy Johnson's Riding on the Metro Socks, from her book, Socks from the Toe Up. The socks were knit in Dream in Color Smooshy (my favorite sock yarn) in the Visual Purple (VS180) colorway. (As always, click on any photo to enlarge.) I had to modify the socks to fit my narrow feet, so instead of having parallel "columns" of stitches on the sides, my socks have only one column. They were fun to knit, although the pattern didn't make my "top five" list of Ms. Johnson's sock patterns. I started the socks on 01 February and finished on 25 February.

The second pair of socks, Ms. Johnson's Sportweight Socks with Gusset Heel, were knit with Lorna's Laces Shepherd Sport yarn, in the Lakeview (504) colorway. The socks are an easy, fast knit. This pair, like the previous pair, is knee length. I started these socks of 24 February, although I didn't knit past the toe increases until I'd finished the previous pair. I finished these socks on 05 March. Technically, that makes them February-March socks, but I'm counting them for February, since I was unable to take a good photo of them until this morning.

I am also plugging away on my third shawl of 2011. There is no pattern to speak of, only the center and edge increases. The absence of a pattern makes the shawl a good project to carry around and knit on, but it's also rather boring. The shawl is about two-thirds complete.

I have not  yet blocked the first two shawls (Multnomah and Gaia), which I knit in January. I could not block the shawls when I finished them because I still had pins in my foot from surgery right before Christmas. But the pins have been out for nearly a month, and this week is Spring Break, so the shawls will be blocked this week.

After finishing the Sportweight Socks on 05 March, I started my March socks on 06 March. More about the March socks in a future post.

What are you knitting this month?

Susannah

Tuesday, February 1, 2011

January---four finished objects!

January has started off the knitting year well, with four (count 'em, four!) finished objects. The first couple weeks of the month, I was sofa-bound after foot surgery, so I did a lot of knitting. In January, I started---and finished---two shawls, Multnomah and Gaia, and two pairs of socks. The shawls haven't been blocked yet, so today's post is about the socks.

Regular readers of this blog won't be surprised to hear that both pair of socks were by Wendy Johnson. The first pair, for a knit-along (the Socks from the Toe Up KAL group, for those of you on Ravelry), was Sheri's Posies Socks. My Posies were knit with Lorna's Laces Shepherd Sock, in the Grapevine colorway. (As always, click on any photo to enlarge.) I made some modifications to fit my narrow feet. I removed two stockinette  stitches on either side of the center panel. Then, because of a gap developing at the beginning of the round next to the side panel, I moved the side panels one stitch closer to the center. If I knit these socks again, I won't move the side panels; the crisp line up the side "seams" became, instead, a four-stitch column. My final modification was to use K2, P2 ribbing, which, in my opinion, holds socks up better than K1, P1.

I started these socks on 02 January and finished them on 29 January.

The second pair of socks was Ms. Johnson's Sunrise Socks. These socks were knit with Zitron Trekking Hand Art yarn, in the Atlantik 506 color- way. This yarn had some difficulty deciding what pair of socks (i.e., what pattern) it wanted to be.  The color repeats are so short that the color variation can obscure the pattern. These socks were ripped back to the end of the toe increases twice as I attempted to find a pattern that suited the color variation in the yarn. The Sunrise Socks were a good choice, since the patterning is minimal. The only change I made in the pattern was in the ribbing; I used P3, K3 ribbing, and added two stitches near the end of the first round of ribbing for a true P3, K3 rib. I started these socks on 04 January (I think---all that ripping back to the toes makes it difficult to remember) and finished them on 31 January.

Is your knitting year off to a good start?

Susannah

Sunday, January 9, 2011

More December Finished Objects!

I'd better post photos of the rest of the knitting projects I finished in December. (Particularly since I completed my first FO for 2011 yesterday.)

The first item, the Frosting Shawlette by Erica Jackofsky (a.k.a. Fiddle Knits), was knit in July and August (27 July--11 August), but not blocked until the weekend before Christmas. The shawlette, which was a fun, fairly fast, and easy project, was still one from which I learned something new. I had never encountered bird's-eye lace before, but as you can see from the photo, the border of the shawlette is all bird's-eye lace. (As always, click on any photo to enlarge.)

The Frosting Shawlette was knit in Frog Creek Fibers Verdant yarn, in the Cinnamon Toast colorway. I liked this yarn a lot; unfortunately, the dyers are on an indefinite hiatus. This shawlette was my Christmas gift to my son's girlfriend.

The next finished object, another shawl, was also started in the summer. I designed this shawl to be knit with one skein of yarn, and started knitting it in mid-August. I knit on it for three days, then set it aside, and didn't pick it up again until the day after Christmas, and finished it in three days. When I picked it up again, I ripped out several rows and changed the pattern---unfortunately, not for the better. But it was my first triangular shawl design, and I learned several things from it, so in that respect, it was a success. This shawl was knit in Great Adirondack Silky Sock, in the Grenada colorway. Since this shawl was an experiment, I made it for myself.

My third finished object in December was a Lacy Karius shawl that I'd started in the summer. It, too, sat for a long time---in this case because I found knitting it very boring. It was knit with Socks That Rock lightweight yarn in the Bejewelled colorway. I had never knit with this yarn before, and although I liked it, it was thicker than I expected---closer to sport-weight than fingering. (Or, to use the Yarn Council's terms, more fine than superfine.) The colors are glorious; the pattern, as the second photo shows, not very exciting at all.

My final finished object for 2010 was the pair of socks I knit in December. These socks are Wendy Johnson's Basic Gusset Heel Socks. I knit them using Opal Antonia aus Tirol yarn, colorway 2802. I started the socks on 04 December, finished the knitting on 30 December, then wove in the ends and blocked the socks on 31 December. Since I wasn't sure I would finish the socks before or after Christmas, I made them for myself. : )

Did you end the year with a knitting blitz? I had hoped to finish a few more things, but...

Susannah

Friday, December 31, 2010

Finished Objects!

The past few months have been rough, but although I haven't posted, I have been knitting.

Just before Thanks-giving, after a bout of hospital knitting, I finished a pair of socks. The socks, Wendy Johnson's Van Dyke Socks, shown in the photo to the right, are being modelled by the happy recipient, The BoyChild (formerly known as Mr. BigFoot). These socks were knit with Colinette Jitterbug in the Velvet Damson colorway. They were a fun, and fairly fast, knit. (As always, click on any photo to enlarge.)

Early this month (on 02 December to be precise), I finally finished a pair of socks I'd started at the end of August. The recipient, who wears a size 13 (!!) shoe (and is the new Mr. BigFoot),  requested a plain stockinette foot, which I found incredibly boring. But socks are good hospital knitting, so after I finished the Van Dyke socks, I pulled this pair out of the "started but not yet finished" basket. These socks are another Wendy Johnson pattern---her Traditional Gansey Socks. I used a gusset heel on these socks, which seems to be bigger through the ankle area, since the recipient has a problem with swelling of his feet and ankles. These socks were my Christmas present to my dad, and he likes them very much. The socks were knit using Zitron Trekking Pro Natura, in the Denim Blues colorway.

I finished another project on 21 December---a sweater-tunic for my oldest grand-niece, which has been languishing in the "you-need-to-finish-this" basket since last February. (Some of you may recall that this was one of my projects for the Ravelympics.) The sweater body was been finished since January; all that was left to knit were the sleeves and the neckband. Because my grand-niece had requested that the sweater be long enough to wear as a tunic, I had to order another skein of yarn. My LYS (local yarn store) no longer carries this yarn, but I was able to find some online. After finishing the sweater-tunic, I had about half a skein of yarn left, which I used to knit a (rather-short) scarf. The photo at right shows both being modelled by the delighted recipient. This sweater was knit using Universal Yarn Classic Worsted Tapestry yarn, in the Playtime colorway. The pattern is a variation on Ann Norling's basic kid's sweater pattern. The scarf is a  K1, P1 rib.

I have three finished shawls and (with some industrious knitting tonight) another pair of socks to talk about, but I'll save them for tomorrow.

Did you have a finished-object spree this month? If so, what did you finish?

Susannah

Sunday, August 15, 2010

Progress

I finished the shawlette for which I was test knitting the pattern on Wednesday (the 11th). I was afraid that I would run out of yarn before I reached the end of the pattern, but after I bound off, I had two whole yards of yarn left. That's about as close as I care to come.

With the wedding stole, on the other hand, I will have yarn left over when I reach the end of the pattern. Last night, I hit the 85 percent mark: I left off halfway through the ninth pattern repetition. (The pattern calls for ten repetitions.) I may add a few more pattern repetitions, to add a bit of extra length and to use all the yarn.

I will post pictures of the shawlette and the wedding stole once the designers publish the patterns and/or give me the okay to post photos of their designs.

I was waiting to finish the shawlette before casting on a shawl of my own design, but despite the shawlette being finished (not blocked yet---that's a project for later today), I still haven't started that particular shawl. I did, however, start Jared Flood's Girasole, as part of a KAL (knit along) with a group of ladies (mostly) and gents (a few) in one of my Ravelry groups. I've also started another, large shawl pattern test knit. The new large shawl test knit is a circular shawl, knit in fingering or laceweight yarn. I'm using fingering yarn because I didn't have enough (1400-1600 yards) of any laceweight yarn.

One of the reasons I haven't cast on the shawl of my own design is that I have been working, off and on, on the Coat of Many Colors---the Adult Surprise Jacket knit in various Noro Silk Garden colorways. The Coat of Many Colors now has buttonholes! (TCOMC has been waiting for its buttonholes since mid-January. In April, for part of a day, it had ugly one-row buttonholes. Now, however, it has nice, neat, three-row buttonholes.) I need to knit a couple more rows on the placket, then it will be time to bind-0ff. Long-time readers of my blog will recall that the placket row has more than 700 stitches, so knitting a row takes a while. Early in the week, TCOMC was my it's-too-late-at-night-to-knit-lace project; now the Girasole seems to have taken over that role. But I will finish TCOMC this month! Once the knitting is completed, I'll have to weave in the skillions of yarn ends on its back side. (The photo shows the state of the Coat of Many Colors in late January.)

I want to cast on the shawl I designed in the next day or two. I plan to knit it during the "Kick-off Celebration"---the Powers That Be's term for the mandatory three days of speechifying, meetings, etc. that faculty and staff are required to attend on Wednesday, Thursday, and Friday.

I have not yet cast on my August pair of socks. Socks would be another good project for the Kick-off Celebration, so I hope to get this month's pair started before Wednesday morning. Or perhaps I'll start them Wednesday morning, during the first speech of the day. This month's pattern is a more manly one than most of Ms. Johnson's patterns, so I was contemplating knitting these socks for the Boy Child. But given that this month is half over, I may not have time to knit for Bigfoot. I'll have to think about that some more between now and when I cast on.

Also on the needles---but about three weeks behind the rest of the group---is an Aran KAL. This sweater (called Ingvold Aran) is being knit from the top down. I'll be knitting a cardigan, but at the moment, I'm still working on my swatch cap. A lapful of worsted wool is a bit much in 90-plus degree weather (which is why I'm three weeks behind everyone else, since they live in cooler climes).

What are you knitting this month?

Susannah

Sunday, August 1, 2010

Finished Objects!

I have finished several projects this month---three shawls and my July pair of socks.

The first object finished was a scarf/shawlette. The pattern is called Baktus. It's a simple, easy knit---all garter stitch---and it is knit from one side to the other. Mine was knit with two skeins of Crystal Palace Mini Mochi yarn in the Tropical Ginger colorway. I started this scarf on 29 June and finished on 11 July. This scarf will be a Christmas present for my youngest sister or one of my nieces. Once I have all my Christmas knitting done, I will decide who gets what item. (As always click on any photo to enlarge.)

The second object finished was a lace scarf for which I test knit the pattern. The pattern is called Easy Bamboo Lace Scarf, and it is by Michelle Miller (a.k.a. Fickleknitter). My scarf is made out of Monkeypal Superwash Sock yarn, in the Purple People Eater colorway. It was a fast, fun, and easy knit. I started on 08 July and finished on 15 July, despite several restarts attempting to get gauge. The photo at left, taken while the scarf was still on the block board, shows the pattern better; the photo on the right shows the color variation and the "big picture."




My third finished object was a shawl. (Are you noticing a trend here?) The pattern is Reflection Shawl by Ruth Greenwald. It is knit with Fleece Artist BFL Sock yarn in a colorway dyed for a sock yarn club I belong to. (BFL is Blue-Faced Leicester.) This was the first time I'd used a yarn with a BFL base, and I liked it. This shawl was also a fast knit. I started on 17 July, restarted (because I thought my cast-on was too tight) late (nearly midnight) on 18 July, and finished on 24 July. This shawl was knit from the neck down---but started with only 11 stitches (the center panel and two stitches on either side of it). As I neared the end of the pattern, I had plenty of yarn left, so after determining how many yards it took to knit a row, and how many yards of yarn I had left, I added ten rows of eyelet alternating with garter stitch ridges before the final rows of eyelet and garter stitch. This shawl is my younger sister's Christmas present. When I opened the package and saw the yarn, my first thought was "Linda yarn." Her favorite color is yellow.

My fourth---and final---finished object this month was my July pair of socks. These are Wendy Johnson's Serpentine Socks from Socks From the Toe Up. My socks are knit with Colinette Jitterbug, a wonderful sportweight sock yarn that I had never used before, in the Blue Parrot colorway. Although at first glance the pattern appears to be cables, there is nary a cable to be found. The movement of the stitches is accomplished by strategically placed yarn overs and knit two togethers or yarn overs and slip-slip-knits. The bottom photo shows the pattern and the color variation in the yarn. These socks were another fast, fun knit. I started my socks on 01 July, knit regularly on them until the heels were turned on 06 July, then got distracted by shawls, etc., and barely touched them again until the end of last week. I finished my socks on 27 July.

As you can see, I knit until I was almost out of yarn, resulting in knee socks. The socks hadn't been blocked yet when this picture was taken, which is why I'm modelling them instead of my sock blockers doing the modelling.

Although I hoped to finish a few projects that have been languishing on the needles for a while, I wasn't able to do that. But I have been working on the sleeves of my great-niece's sweater-tunic.

I've been wanting to start a sweater. I've knit the gauge swatch, and since the sweater is an Aran with a lot of different cables, I'm knitting a swatch cap, so I'll know the gauge for each of the cables. Before I can start the sweater, though, I have to finish the one of the Adult Surprise Jackets, since my two US8 size long circular needles are being used on the ASJs.

The wedding stole I'm test knitting is coming along. I'm about halfway through the third pattern repetition.

What are you knitting this summer?

Susannah

Monday, July 19, 2010

New Projects, Old Projects, Languishing-on-the-Needles Projects

I have some FOs (finished objects) to show you as soon as the second one comes off the blocking board. These finished objects are not socks.

Are you amazed? Astounded? Flabbergasted?

I am even a bit surprised. In fact, the pair of July socks that had its heels turned on 06 July is still a couple inches short of a leg. And, if that weren't enough, the third June pair of socks, which had one heel flap knit on 05 July, is still waiting for the other heel flap to be knit (and the legs).

So what have I been knitting? Scarves and shawls.

The two finished objects are both scarves. And I have three other scarves/shawls on the needles.

Why three more? A hard one, an easy (i.e., almost mindless) one, and one that requires thought and stitch counting but not to the exclusion of everything else.

One of the shawls, a wedding stole, is knit in cobweb lace. I have not knit with cobweb lace since I was a kid. On this project, I got off to a rough start. There was an error in the pattern directions, which I did not realize until after I had knit the first row and still had four stitches on the needle. Ripped out, restarted, got through the first row just fine...and somehow lost a stitch---a yarn-over---when I purled back. Ripped and restarted (again).  The third time, I added two rows of stockinette stitch at the bottom of the pattern. Since I always cast on to a larger needle, I was having a hard time starting the lace pattern and changing from one needle to  a smaller one, so I gave myself the two rows of stockinette to change needles and to establish the border, and to set two markers in open sections of the pattern.

The markers made a big difference. Instead of counting from the beginning, I only had to count 36-40 stitches. I could count stitches in each section as I knit them and when I reached the marker, to ensure I hadn't dropped a stitch or lost a yarn-over or, on the back side, inadvertently purled a yarn-over together with the next stitch.

After about 10 rows, I decided that the yarn needed a larger needle. But I'm test knitting this pattern for the designer, who wants to know the gauge I get with a US3 needle, so I had to change the yarn, since I couldn't change the needle.

With the second yarn (the cobweb lace) and with the pattern error in the first row corrected, and with two stockinette rows at the beginning and two markers in open sections of the pattern, I haven't had to tink back more than 40 stitches. (And I've only had to do that once.)  But I can only knit four rows at a time, then I have to do something else for a while.

The stole coming along, but s-l-o-w-l-y. The pattern is 113 stitches wide, with 36 rows. The stole requires ten pattern repetitions. I'm ready to knit row 19 in the first pattern repetition.

More on the other scarves/shawls later. This month I'm also determined to finish some projects that have been languishing on the needles for months: the two Adult Surprise Jackets (one is called Coat of Many Colors) and my oldest grandniece's sweater-tunic. Watch the progress bars on the left (in the "On the Needles" section) to see if---and how quickly---I follow through.

Once I get those finished, there's another project, called Purple Jacket, that hasn't been touched for about a year. Partly that was due to my gauge change, partly to a lack of time, and partly because the sections of the project still to be knit aren't as interesting as the initial section.

What are you knitting? Have you made any knitting resolutions this summer?

Susannah

Thursday, July 1, 2010

Second Pair of June Socks---and Other Projects

I finished my second pair of June socks yesterday afternoon. This was the first pair of socks I started in last month, but the yarn was much thicker than most sock yarn and stiff and, therefore, difficult to knit, so after three days I set the socks aside and started the pair I posted about last week. Once that pair was finished, however, I began working on this pair again. (Click on any photo to enlarge it.)

The socks, like the first pair, are Wendy Johnson's Diagonal Lace Socks from her book, Socks From the Toe Up. It was a fun, easy to read (or memorize) pattern, and the resulting socks are lovely. The yarn is Pagewood Farm Glacier Bay, in the Grape Juice colorway. The manufacturer calls this yarn "their thickest, baddest sock yarn," and on another page of their Web site describes it as an "ultra light worsted." The socks will certainly be warm on cold winter days, but I would have appreciated it if the manufacturer had indicated on the label that the yarn was not typical superfine (fingering weight) sock yarn.

I had a third pair of socks on the needles in June, but didn't finish them. They started out as the second pair of Diagonal Lace Socks, but when the color variations in the yarn I was using for another pattern (Ms. Johnson's A Finer Peace Socks) obscured the pattern, I ripped both pairs back to the toe increases, and switched the patterns. The color variations didn't affect the Diagonal Lace pattern (see the photo of last week's socks), and the semi-solid color of what had been the second pair of Diagonal Lace Socks worked very well for the A Finer Peace Socks. But the A Finer Peace pattern was very similar to Ms. Johnson's Peace Socks, of which I made two pair last October (see here and here), and bore some similarity to the Lace and Cable Socks I knit in April. I wasn't enjoying knitting that pattern, so once again, when I was about halfway up the foot, I ripped back to the toe increases and changed patterns. I'd knit almost---but not quite---to the heel turn by 28 June, and had a good chance of finishing the third pair of socks...

Except that I started another shawl on 29 June.

I already have a large circular shawl (of my own design) on the needles. One shawl at a time should be enough, right? Apparently not. The recently started shawl is smaller---sort of a cross between a scarf and a shawlette---and triangular instead of circular.

The circular shawl I call Starburst. It is knit with Jojoland Melody Superwash yarn, in the lavender colorway (MS-28). The triangular shawl is a pattern called Baktus. It is knit with Crystal Palace Mini Mochi yarn in the Tropical Ginger colorway (0133). Both shawls are larger now than when these photos were taken. The progress is more noticeable on Baktus, but its visible on the Starburst shawl, too.

Now that the first summer session is over, my summer vacation has started. (Hurray!) My goals this month---in addition to two pair of socks---are to finish three UFOs (unfinished objects): the two Adult Surprise Jackets and my grandniece's sweater-tunic. All three of these have been languishing on the needles for months. I haven't knit a stitch on the Dream in Color Adult Surprise Jacket since February, on the sweater-tunic since early January, or on the Noro Adult Surprise Jacket since April. (Photos of all three garments are here.) Once those three are complete, then (and only then!) I intend to start an Aran sweater or jacket.

What are your knitting plans for the month or the summer?

Susannah

Saturday, June 26, 2010

First Pair of June Socks


I completed my first pair of socks for June last weekend. I finished knitting them late Friday night, and finished the finishing (weaving in the ends of yarn at the toe and cuff) Saturday afternoon. The socks are Wendy Johnson's Diagonal Lace Socks, from her book Socks from the Toe Up, knit with my favorite sock yarn, Dream in Color Smooshy, in the Lunar Zazzle colorway. (As always, click on the photo to enlarge it.) The pattern is easy to "read" from the socks themselves (or to remember, if you aren't experienced enough to "read" the pattern in the sock), and the socks were fun to knit.

The pair shown is actually the second pair of Diagonal Lace Socks I started. The first pair is still a WIP (work in progress). I found the yarn, which is thicker than most sock yarn, as well as stiffer, difficult to work with, and after four days of feeling like I was fighting the yarn every inch of the way, I set the pair aside and started the socks shown above. I turned the heels on the first pair tonight, so I hope to finish them before the end of the month. 

What are you knitting?

Susannah

Sunday, June 6, 2010

May Socks...and Other Things

May, with final exams, commencement, and all the end-of-the-academic-year "stuff," is always a busy time. It was especially busy this year since my department was interviewing candidates for three positions (two new, one existing), and most of that interviewing was done after commencement and exams---that is, during what should have been the first two weeks of summer vacation for the faculty.

But, despite all the work-related duties and distractions, I managed to knit two pair of socks in May. The first pair (shown at right), Wendy Johnson's Labyrinth Socks, from her book Socks from the Toe Up, was knit with sportweight yarn. I don't have much sportweight yarn, and what I did have contained lots of color variation, which I knew would obscure the pattern. Then, tucked away in the "maybe I should get rid of this yarn" box, I found a sportweight cotton that did not have much color variation, so I used it. The yarn is Cascade Fixation, a 98 percent cotton, 2 percent elastic yarn, in the Hot Pink Effects colorway. I was pleased with the results, as was my mother, for whom I knit the socks. She is modelling them in the photo. (As always, double click on a photo to enlarge it.) The socks were a quick, easy, fun knit.

The second pair of socks I knit, Wendy Johnson's Catnip Socks (shown at right), was not as quick or fun (in my opinion) to knit, but they are lovely. They took longer to knit because the pattern calls for superfine (fingering weight) yarn---I used Araucania Ranco Multy in colorway 302---but the pattern repetition was easily memorized. Initially, I knit a short-row heel, but as I started up the leg, I decided that I didn't like the way the short-row heel looked, so I ripped it out and, instead, knit a gusset heel, which worked beautifully and looked great. These socks were a gift for my youngest sister, who saw them a few days before they were finished and liked them very much.

As a result ripping out the heels and reknitting them, I didn't finish these socks until about ten minutes before midnight on 31 May, but I did get them done, including weaving in the ends, before the month was officially over!

As for Other Things...I was conned---er, persuaded---into teaching a summer school class, Thermodynamics, in the first six-week summer session. I had said I wouldn't teach summer school unless at least five students were signed up. Six students had signed up for this class. One dropped before the first class, after hearing how much work would be required. One, having heard my first class "we are doing two and a half weeks of regular semester work every week, so you cannot get behind and you must do several hours of homework every night" spiel, dropped between the first class and the second. He told one of the other students that he was withdrawing from the class because of "scheduling conflicts," but since the students set the class time, after asking about and discussing everyone's work schedules, "scheduling conflicts" is a flimsy excuse. (Even the student who had been given this explanation didn't believe it.)

So, by the second day, I was down to four students, but by then it was too late for me to change my mind about teaching the class. The first exam wasn't pretty, but no one gave up. The second exam was ugly---so ugly that I declared it was a "practice test" and that there would be another exam tomorrow (which there will be). One student emailed me after the test to say that she was dropping the class. Another student didn't show up for class the day after the test. Although I haven't officially received notice that either one has dropped, I think it is safe to say they won't be back. Now there are two students. Spending twelve hours  a week teaching Thermodynamics to six students is one thing; spending that same twelve hours a week teaching two students is a whole 'nuther thing. (The twelve hours is only the time spent lecturing; it does not include lecture prep, test prep, grading assignments, etc.)

One final Other Thing...remember the three positions for which my colleagues and I were interviewing candidates? The Powers That Be informed the dean and me a week ago that only two of those positions are in next year's budget. No one could satisfactorily explain why all three positions were not in the budget. Nor could TPTB satisfactorily explain why we have been interviewing candidates in three areas when there are only two positions in the budget. Needless to say, I was not amused. Nor do I relish another year of being one faculty member short in my department. What, one wonders, do administrators use for brains?

How is your summer going?

Susannah

Saturday, May 1, 2010

April Socks

This month, being the last four weeks of the semester, has been even more hectic than the previous three. But yesterday was the last day of classes. (Hurrah! I was probably as happy about that as any of my students, even those with a severe case of senior-itis.)

Last night, since it was Friday and it was the last day of class, I sat and knit. (I did not grade a single paper, despite having a rather large, just-turned-in pile of senior design reports awaiting my attention.) I was six rows of ribbing short of finishing my April socks, and since it was also the last day of the month and since I hadn't knit a stitch for days, I was determined to finish the socks.

And I did.

The socks are Wendy Johnson's Lace and Cable Socks, from Socks From the Toe Up, knit in Dream in Color Smooshy yarn in the Beach Fog colorway. (Click on the photo to enlarge.) The socks were a fun, easy knit (I'll explain my tricks for cabling without a cable needle another day). I added the lace panel on the front to the back of the leg.

This month's pair of socks, Ms. Johnson's Labyrinth Socks from Socks From the Toe Up, calls for sportweight yarn. I don't have much sportweight yarn, and most of what I have is multi-colored yarn for which the colors pool and/or landscape. Last night, while I was mulling over the yarn possibilities, I worked on the other pair of April socks (that is, the alternate pattern, Ms. Johnson's Swan Song socks), for which I had cast on and knit eight rows earlier in April, but hadn't touched since. Since I am still mulling over yarn choices, I knit more on the Swan Song socks this morning.

What have you been knitting?

Susannah

Tuesday, March 30, 2010

Socks Times Two

I finished the red socks for my younger sister (see 09 March 2010) on 20 March, but haven't gotten home from work while it was still daylight to take a photograph of them. I was finally able to take a photograph of them over the weekend. (Click on a photo to enlarge it.)

She wanted knee socks, and knee socks she got. The legs are 14 1/2 inches long from the bottom of the heel to the cuff. That's a lot of sock, even in a size small---147 square inches. The pattern is Wendy Johnson's Nanner Socks.



Last night, I also finished the pair of socks I was knitting (for myself) this month. They, too, are a Wendy Johnson pattern; this one is her Waterfall Socks. Both patterns are fast, easy, and fun to knit, and the results are lovely.

The red socks were knit with Lorna's Lace Shepherds Sock yarn in the Bold Red colorway. The Waterfall socks were knit with Dream in Color Smooshy (my favorite sock yarn!) in the Into the Mystic colorway.

The Waterfall Socks are almost as long as the red socks, but, since I'm quite a few inches taller than my younger sister, the Waterfalls are a couple inches short of being knee socks. I wore them today, but if anyone noticed, they did not comment.

I knew, and I suppose that's all that matters.

I'm currently turning the heels on another pair of socks---yet another Wendy Johnson pattern, this one her Mallow Socks. I hope to finish them before April 1st, when the next sock challenge begins, but that seems unlikely. Knitting while reading a pattern off a chart always takes longer than knitting a pattern with an easily memorizable repeat.

What are you knitting now?

Susannah

Tuesday, March 9, 2010

Knitting Olympics, Part II

My knitting olympics was not as successful as I had hoped. I had three WIPs (works in progress) that I hoped to finish---a sweater-tunic for my oldest grandniece and two Adult Surprise Jackets for myself, one in Noro Silk Garden Worsted, the other in Dream in Color Classy in the Dusky Aurora Colorway---as well as pair of socks I hoped to knit for my younger sister.

By the closing ceremony, the socks (Wendy Johnson's Nanner Socks) were two-thirds to three-quarters finished. The legs were only about three inches long, which means I knit 10 inches worth of two socks. (Or twenty inches of "tubing," 7 inches in circumference.  That's 44+ square inches of sock. To put that into terms non-sock-knitters can readily understand, if I'd been knitting a strip one inch wide, it would have been 44 1/2 inches long by the closing ceremonies.) I have worked on these socks, off and on, since. When I asked my sister over the weekend how long she wanted the leg of the socks, she said she preferred knee socks. So, I still have a few inches to go.

As for the WIPs, I never touched my grandniece's sweater-tunic, which still needs sleeves and a neckband. I also never worked on the Noro Adult Surprise Jacket (a.k.a. the Coat of Many Colors). I need to pick up the buttons I ordered before I can knit the next row---the row with the buttonholes---and I never got to my LYS (local yarn store) to pick them up.

In hindsight (so much clear than foresight!), I ought to have started with the project closest to being finished instead of the one with the most still to knit. But I didn't.  I did, however, add five inches to the other Adult Surprise Jacket. (Back to the hypothetical one-inch strip. If I'd been knitting it instead, I would have increased its length by more than 200 inches.) I left the much lighter colored skein of yarn in the jacket, and knit about five more inches---almost two more skeins of yarn. The two skeins after the light one are darker, but not quite as dark as the first three skeins. I'll post a photo of the jacket when it is finished.

I will pick up the buttons on Friday. This week is spring break, so there are few demands on my time, other than the ever-present grading. Grading is the main reason why I didn't make more knitting progress during the Olympics. I only knit during the figure skating and speed skating, and I graded during all the other events.

While I didn't get as much knitting done during the Olympics as I hoped, I did get most of a pair of socks knit and made significant progress on one of my jackets. And I didn't fall behind on the grading. All in all, I'm pleased.

Susannah

Wednesday, February 17, 2010

Knitting Olympics

Since completing the Purple Socks last weekend, I have not yet cast on another pair---which is unusual. I'm not sure why I haven't been motivated to do so, since the next pair, which are for my younger sister, are my entry in the "Sock Hockey" event for the Ravelympics.

For those of you who have not, perhaps, heard of Ravelry, it is like Facebook for knitters and crocheters. The Ravelympics is a knitting Olympics, in which you are supposed to challenge yourself, the same way the athletes do when they compete.

In addition to my "Sock Hockey" entry, I have three entries in the "WIPs Dancing" event. (A WIP is a work-in-progress.) My first entry is a sweater-tunic for my oldest grandniece, which I started in November. The front and back of the sweater are finished. I knit the shoulders together early in January, but have not been motivated to knit the sleeves and neckband. (I also haven't had much time to knit the past month, but that's another story.)

Instead of starting the next pair of socks, or finishing my grandniece's sweater-tunic, I have been knitting one of Elizabeth Zimmerman's Adult Surprise Jackets.  (I'm actually knitting two of them at the same time---both entries in the "WIPs Dancing" event---but can't do any more on the other one until I get to my LYS (local yarn store) to pick up the buttons I ordered a month ago.) The Adult Surprise Jacket I have been knitting is coming along slowly but surely. It is knit with Dreamy in Color Classy in the Dusky Aurora colorway.

I love Dream in Color yarn, both the Classy, which is worsted weight, and the Smooshy, which is fingering weight (and, thus, great for socks). But Dream in Color yarn, which is hand-dyed, does not have dye lots, so if you order it online (as I did), you don't know what you're going to get until you get it. As you can see from the photo, what I got was three skeins that were quite dark in color, and several that were lighter. And being the kind of person who likes everything to be just so, I don't like the obvious change in color. It isn't quite as drastic as in photo, but it is very noticeable. Since since I do most of my knitting at night, in artificial light, I didn't notice how much lighter that fourth skein was until about a week later, when I was nearly finished knitting that skein. The remaining skeins of yarn range in color, too, and while none are quite as light as the problem skein, there are a couple of lighter ones. I started skein five and have kept on knitting, but...


Should I put all the light skeins together so that it looks like I planned the color change? Should I try to spread them throughout the jacket? What do you think?


Susannah

Ring Memberships